Waterproof Membrane Construction Process
2012-06-20 04:12:25
Waterproof Membrane Construction Process
1.Roof waterproof layer construction
Acceptance grassroots---- Clean up the surface trim------- Besmear brushs polymer binder materials
-------- Detail strengthening processing---- waterproof layer--- The processing nodes seal.----- maintain---- Shutting water test----- check and accept----- protective layer
2. Underground waterproof layer construction
Acceptance grassroots---- Clean up the surface trim-----Besmear brushs bonding material--- Detail strengthening processing----- waterproof layer----- The processing nodes seal--------maintain---- check and accept
3.The kitchen between who waterproof construction
Acceptance grassroots----Clean the base course-- Detail structure additional layer handles---- Besmear brushs polymer binder materials----- Waterproof layer paste----- Dense seam sealing side
------ check and accept----- The first water storage test---- check and accept---- protective layer---- Facing construction--- The second storage test-----àacceptance of engineering quality